The Little Falls Common Council unanimously passed all ten resolutions on its agenda Tuesday, Oct. 6, approving a $1.8 million aerial fire apparatus, setting a public hearing on a property tax cap override, and adding two engineering contracts at the city’s water and wastewater plants.
Mayor Deborah Kaufman also delivered an upbeat financial report, citing improved fiscal stress numbers and a record crowd at the Cheese Festival.
Resolution 61 authorizes the Mayor and Fire Chief to order a Sutphen SP70 Aerial Platform for the Little Falls Fire Department at a negotiated cost of $1,811,349.71. The resolution says the department’s current frontline aerial is 35 years old and has reached the end of its optimal service life, affecting response standards, firefighter safety, and the city’s insurance rating.
The SP70 pairs a compact single-axle chassis with a 70-foot mid-mount platform, a design the resolution says suits the city’s narrow streets and steep hills. The city would buy it through the Houston-Galveston Area Council (H-GAC) cooperative purchasing program, which state law allows in place of local competitive bidding, with Vander Molen Fire Apparatus Sales and Service as the regional dealer. Because of build schedules, delivery is projected for 2028.
The Sutphen purchase agreement attached to the resolution includes a price adjustment clause tied to a federal producer price index for heavy truck manufacturing. If that index rises more than 5% before production, the city could owe the difference above 5%. Once signed, the city cannot cancel without Sutphen’s consent, and cancellation fees run from 10% to 30% or more of the price.
Tax Cap Override Heads to Public Hearing
Resolution 62 schedules a public hearing on proposed Local Law 11 of 2026, which would let the council adopt a budget with a property tax levy above the state tax cap under General Municipal Law Section 3-c.
The hearing is set for Tuesday, Nov. 3, at 6:30 p.m. in the Common Council Chambers at City Hall, 659 E. Main St.
The proposed law says the state cap may limit the city’s ability to provide essential services and maintain critical infrastructure. Passing an override requires at least 60% of the council’s total voting power.
The city will publish notice of the hearing in the Times Telegram and The Daily Post at least five days before the hearing.
Water and Wastewater Engineering Costs Grow
Two approved resolutions add about $184,000 to engineering contracts at the city’s water and wastewater plants.
Resolution 66 approves Amendment No. 2 with Wright-Pierce Engineering Consultants, adding $85,000 and raising the contract from $568,000 to $653,000. Much of the new work stems from the state Department of Health’s review of the Slow Sand Media Replacement project.
The state is requiring disinfection of the new filter sand, and the city is seeking a variance to use less costly local sand from Poland Sand and Gravel that is not NSF-61 certified.
The amendment also covers continued oversight of the temporary membrane treatment plant, whose rental the city extended 12 months through September 2027. It adds bidding services for the sand project, a cost estimate for buying a 1 million-gallon-per-day membrane system, and help responding after the state moved the city’s water project (No. 19261) from the annual Drinking Water State Revolving Fund list to its multiyear list.
Resolution 67 approves Amendment No. 7 with GHD Consulting Services for the Wastewater Treatment Plant UV Disinfection Project. It adds $99,028 and 120 days after contractors found deteriorated structural conditions in the Operations Building’s heavy equipment room.
The resolution states the cost falls within the approved project budget and is covered by state Environmental Facilities Corporation funding. The GHD contract, originally $207,800 in 2020, now totals $1,458,278.
Streetlights, Heat Pumps and New Local Laws
Streetlights. Resolution 64 authorizes a two-year maintenance agreement with the New York Power Authority for about 718 city-owned streetlights. Routine maintenance costs $21,540 in year one and $22,186.20 in year two, plus a non-routine repair budget of $37,703.81 per year. The two-year total is $119,133.82, with options to renew for up to two more years.
Heat pump grant. Resolution 63 authorizes the Mayor to sign a $125,000 Green Small Buildings Program grant agreement with the state Housing Trust Fund Corporation. The money pays for heat pumps and related work in five rehabilitated residential units, with a deadline of Dec. 31, 2027.
Building code update. Local Law 9 updates the city’s 2011 rules for administering and enforcing the state Uniform Fire Prevention and Building Code and Energy Code. Changes include a definitions section, post-inspection follow-up, more operating permit categories, and published climate and geographic design criteria. The city held a public hearing at 6:30 p.m. before the meeting.
Fire insurance proceeds. Local Law 10 lets the city claim fire insurance proceeds on damaged properties where city liens exist, under General Municipal Law Section 22. The money can be released to owners who agree in writing to repair or demolish the structure, and the city may require escrow, a bond, or staged payments. The law aims to keep burned-out buildings, especially vacant ones, from becoming long-term hazards.
Appointments. Through Resolutions 65 and 68, the council confirmed two mayoral appointments, each for a four-year term:
- Dale Wagner, Board of Fire and Police. A 36-year Little Falls resident and Niagara University graduate, Wagner retired as vice president of sales for a local textile company. He served as treasurer of Christ Lutheran Church for more than 10 years and as co-president of the Rotary Club of Little Falls for two terms.
- Jocelyn Beers, Recreation/Harbor Commission. A lifelong resident, Beers and her husband, David, both work for the Little Falls school system.
Mayor Reports Improving Finances, Record Cheese Festival
Mayor Kaufman reported the city holds $1,998,269 in cash across all funds, including $1,278,636 in the general fund, $638,127 in water and sewer, and $81,506 in the golf fund. All payables are current.
September tax collections totaled $20,982, bringing the year to $4,216,836. Other September revenue included $60,934 from EMS billing, $18,145 in gross receipts, $4,000 in real estate revenue, $97,089 in water, and $83,371 in sewer receipts.
Preparation of the 2027 budget is underway, and the state Comptroller is preparing a deficit-financing certification for a roughly $3 million, 10-year bond. For the first time, the city is prepaying its 2027 retirement contribution, which the Mayor said should save about $7,300.
Audit and fiscal stress. Drescher & Malecki has submitted the city’s 2025 annual financial report audit to the council and Comptroller. Recommendations address capital asset and depreciation records, dual sign-off on journal entries, and routine reporting of budget adjustments.
The Mayor said many items stem from manual processes, with automation and new reporting systems targeted for full use in 2027. She also noted the city’s fiscal stress score from the state Comptroller dropped 8 points in 2025, a sign of an improving financial condition.
Cheese Festival. The festival drew a record of about 18,000 visitors between 10 a.m. and 5 p.m. The Mayor credited Teri Chace and Team Cheese.
Main Street Area. Ivy Gardens is nearly complete, with lease applications open and its Tudor-style exterior paint being restored. Grant applications and site plans are in progress for the Snyder Apartments and Burrell Building. Interior work continues at the former Berkshire Bank building, where a new tenant is expected by year’s end.
Downtown Revitalization Initiative. Design and engineering will advance this winter on the $3 million canopy and streetscape project, and the city is discussing a grant extension with the state.
The Mayor said NYPA has delayed the $1.8 million to $2 million Seeley Street Promenade by three to five years, if it happens at all. The city will need to proceed on its own and front the costs until it receives state reimbursement. Because the city has prioritized financing for essential services and water emergencies, she said the state’s extension is most welcome.
Watch the Full Meeting
Want to see the discussion for yourself? Watch the full Oct. 6 Common Council meeting, including comments from the floor, the City Engineer’s report, and the Mayor’s full remarks, on YouTube or below.
Discover more from The Daily Post
Subscribe to get the latest posts sent to your email.


Mayor Kaufman needs to break Ted Wind’s record of 30+ years as mayor since the city has no term limits. It’s the only way we might get out of debt!
And what a disaster it’d be if the Seely Street project doesn’t get done. Minus the canopy project on Main Street, it’d be like we got the DRI reward and did nothing with it.